Warsaw Metro Line II

  • Facility Type

    Tunnels/Metro

  • Product Group

    Structural Protection

  • Client

    AGP Metro Polska / ASTALDI S.P.A.

We have installed over 24,000 m² of acoustic insulation on the ceilings of the central section of Metro Line II. The mcr Tecwool F fire-retardant spray system was used for the insulation. The Warsaw Metro is the largest project to date using this system. We achieved a sound absorption class of B. Our company also supplied over 2,100 fire dampers and smoke curtains.

Downloads

Share

You may also be interested in

Implementation of the mcr Tech System for Tapflo sp. z o.o.

Tapflo sp. z o.o. is a manufacturer of industrial pumps and process equipment, delivering its products to 75 countries worldwide. The company’s cooperation with mcr Tech Lab was driven by the search for innovative solutions to optimize production processes.

Go to entry: Implementation of the mcr Tech System for Tapflo sp. z o.o.

Implementation of an Innovative Fire Protection System at the Szkuner Plant

The Szkuner enterprise in Władysławowo, engaged in fishing and fish processing, was founded in 1955. To ensure the facility could continue to operate safely, the company’s President, Witold Wawrzonkoski, faced the challenge of modernizing and commissioning a fire alarm system in the production area, which until then had lacked fire protection.

Go to entry: Implementation of an Innovative Fire Protection System at the Szkuner Plant

Museum of the History of Polish Jews, Warsaw

Structural Protection
Go to entry: Museum of the History of Polish Jews, Warsaw